Product Details:
|
Installation: | Wall Mounted | CPU: | Imported |
---|---|---|---|
ENERGY EFFICIENCY: | First Level | Color: | Pea Green |
Covering Material: | Stainless Steel | Gas Type: | NG/LPG |
Gas Pressure(pa): | 2000/2800 | Display: | LED Displayer Optional |
Pretection Mearure Kind: | 21 Kinds Of Security Protection Measure | Power (w): | 24/28KW |
Product Name: | Wall Mount Gas Boiler | Thermal Efficiency(%): | ≥90 |
CONTROL SYSTEM: | INTELLIGENT STYLE | Main Component: | Imported |
High Light: | 3c 28kw Gas Wall Mounted Boiler,Lpg Central Heating Boiler 26kw,Green Shell Lpg Central Heating Boiler |
26/28kw New Style Gas Wall Mounted Boiler Pea Green Shell Imported Cpu Heating And Bath Function
Product Main Technical Parameter Table
the rated powder input(KW) | 20 | 24 | 32 | 42 |
the rated powder output(KW) | 21.6 | 25.9 | 34.5 | 45.3 |
the thermal efficiency(%) | ≥108 | ≥108 | ≥108 | ≥108 |
rated voltage frequency(V/Hz/W) | 220/230/50 | 220/230/50 | 220/230/50 | 220/230/50 |
the gas pressure(Pa) | natural:2000 | the gas pressure:2800 | ||
living hot water temperature adjusting range(℃) | 30-80 | 30-80 | 30-80 | 30-80 |
heating watertemperature adjusting range(℃) | 30-80 | 30-80 | 30-80 | 30-80 |
domestic hot water production(kg/min ) | 8 | 9.4 | 13.6 | 17.5 |
living hot water apply pressure(mpa) | 0.5-6 | 0.5-6 | 0.5-6 | 0.5-6 |
heating system apply pressure(mpa) | 0.5-2 | 0.5-2 | 0.5-2 | 0.5-2 |
the hightest pressure heating system(mpa) | 3 | 3 | 3 | 3 |
height,width,thickness(mm) | 740*410*315 | 740*410*315 | 740*410*315 | 740*410*315 |
weight(kg) | 40 | 40 | 40 | 40 |
pipe connectors(G) | heating water supply:3/4 | heating water supply:3/4 | heating water supply:3/4 | heating water supply:3/4 |
diameter of smoke pipe(mm) | 60/100 | 60/100 | 60/100 | 60/100 |
Function description of some major accessories:
The role of the burner: It can ensure the normal combustion of gas, which from the nozzle high pressure injection into the burner inside the Venturi tube, causing the pressure in the tube down. Air (the first air) is inhaled and mixed with gas, Which will rush out gas hole to burn. The air that is still insufficient after the first mixing is partially mixed by the second mixing of air around the fire to form a complete combustion.
Q:Are you trading company or manufacturer ?
A:We are factory,located at Qingdao City, China. Welcome your visitanytime!
Q:How can I get the price?
A:We usually quote within 24 hours after we get your inquiry(Exceptweekend and holidays).lf the quantity is not too much, we can offerfor free but delivery cost should be collected. Different products have different MOO, we can discuss step by step.
O:What is the lead time?
A:Usuallv,for small order, our lead time is 15-30davs.If bulk order isover 10000pcs,lead time needs to be discussed step by step.We havestock for most ofour models.
Q:What is your payment terms?
A:We accept T/T and L/C. Others we can dicsuss together.lf you canpay RMB, it will be better.
Q:Do you have a guarantee of your product quality?
A:Now our products are produced in strict quality control system anddefective rate is un-der0.01%. For the defective products, we cansend new ones to replace along with your new order.
Q:What is the shipping method?
A: It could be shipped by sea,by air or by express(EMS,UPSDHL.TNT.FEDEX and ect). Please confirm with us before placing orders.
Q:What is your major product?
A: Our major product is Wall hung gas boiler,Condensing gas heatingboiler.Gas Water Heater, Electric Water Heater, Gas Hob, Range Hood, Gas Oven, and other kitchen appliances.
Contact Person: Mr.Chen Zong Hua
Tel: +8618853255638