Product Details:
|
Housing Material: | Stainless Steel | Gas Pressure(pa): | 2000/2800 |
---|---|---|---|
Power (KW): | 24 | Gas Style: | NG/LPG |
Color Shows: | Black | How To Install: | Wall Mounted |
Product Name: | Condensing Wall Mounted Gas Boiler | Displaying: | LED Displayer Optional |
Heat Efficiency(%): | ≥108 | ||
High Light: | Gas Premixed Condensing Boiler,Copper Heat Exchanger Condensing Boiler,Premixed Gas Condensing Boiler |
Gas Wall Mounted Pre-mixed Condencing Boiler With Copper Heat exchanger
GAS WALL MOUNTED BOILER INSTRUCTIONS
1. Safe and Reliable
With 21 kinds of safe protection•Low failure rate
2. Comfortable
Ultra-quiet operation•more comfortable
3. Convenience
Touch control•more precise
4. Environmental protection
Eenrgy saving and environmental protection•Follow the trend
5. After sale
7*24 after-sales service,worry free
TECHNICAL DATA OF GAS WALL HANGING BOILER
MODEL No. | LLGBQ24-GK |
SPECIFICATIONS |
Q24-GK |
RATED INPUT POWER(KW) |
24kw |
RATED OUTPUT POWER(KW) |
25.9kw |
HEAT EFFICIENCY(%) |
≥108% |
RATED VOLTAGE FREQUENCY(V/Hz/W) |
220/50/120 |
GAS TYPE |
NG/LPG |
GAS PRESSURE(Pa) |
2000/2800Pa |
TEMP.RANGE OF HEATING WATER(℃) |
DHW:30-60℃ HEATING HOT WATER:30-80℃ |
△T=25℃ HOT WATER SUPPLY(KG/MIN) |
9.5Kg |
APPLICATIVE WATER PRESSURE(MPA) |
0.02-0.8 |
DIMENSION(HIGH*WIDE*THICK) | 740*410*315 |
WEIGHT(KG) | 40kg |
DIAMETER OF SMOKE PIPEφ(COAXIAL) | φ60/100 |
PRODUCT DISPLAY
The role of the main heat changer: the main heat changer is the part of heat exchange between the flue gas which is produced by gas combustion and the water in the system. His appearance is thin fin, thickness and distance are set exactly as required. In the case of small boiler size requirements, to ensure sufficient heat exchange area and heat exchange efficiency. The surface of the heat changer has been treated with efficient anti-corrosion , which ensures the service life of the system.
The role of the burner: It can ensure the normal combustion of gas, which from the nozzle high pressure injection into the Venturi tube of the burner, causing the pressure in the tube down. Air (the first air) is inhaled and mixed with gas, Which will rush out gas hole to burn. The air that is still insufficient after the first mixing is partially mixed by the second mixing of air around the fire to form a complete combustion.
Working principle of gas wall hanging furnace
The working principle of gas wall hanging furnace is that natural gas is burned in the wall hanging furnace, the hot water in the wall hanging furnace is heated to a certain temperature, and the water in the wall hanging furnace is transported to the heating equipment. At the same time, the wall hanging furnace can also heat domestic hot water when using natural gas combustion. It can be used for heating and bathing.
ABOUT US
Qingdao Hiounce hvac equipment co., Ltd., located in "brand, the beautiful coastal city - qingdao, China, was founded in the 1950s of the qingdao municipal restructuring state-owned enterprises - qingdao boiler factory. it is a company dedicated to research and development, production of high-grade wall hanging furnace, the electric heating furnace, biomass heating boiler, kitchen burning gas, discharge of oil absorption and the module of boiler fuel gas high-tech enterprises.
Qingdao Hiounce hvac equipment co., Ltd.have more than 100 employees.Company headquarters has total handling, personnel department, finance department, marketing department, the ministry of commerce, office (provincial), purchasing, and import and export department, technology department, engineering department, after-sales service department, and other functions of the eleven departments, through the perfect sales and service network, security, stability, energy saving, environmental protection products supply users.
Contact Person: Mr.Chen Zong Hua
Tel: +8618853255638